Sign permits | Since 1995 | Doral, FL

Sign Permit Expediting in Miami and South Florida

Almost every permanent exterior sign in South Florida needs a permit before it goes up, and lit signs need electrical approval too. Corporate Signs Inc. handles sign permits from survey to final inspection for business owners, property managers, general contractors and national sign companies. We pull permits under our own license, and our in-house permit person is a registered City of Miami permit expediter.

Front elevation of the Bank of America Sunrise Boulevard branch in Fort Lauderdale with dimensional channel letters on the gable

Why South Florida businesses and sign companies call us

Since 1995

Commercial signs designed, built and installed in South Florida from our Doral shop.

Licensed and insured

Licensed electrical sign work, with permits pulled under our own license.

In-house permitting

Our permit runner handles submittals, comments and inspections across three counties.

What our sign permit service covers

Getting a sign permit means the right drawings, sealed engineering when the sign needs it, the property owner's signature, landlord approval, the correct application type, answers to plan review comments and passed inspections. Miss one piece and the job sits. We have worked with South Florida building departments since 1995, and we pull permits for signs we build and for signs other companies fabricate and ship here. Our permit person is a registered City of Miami permit expediter.

Red-post directional sign for bank customer parking and the drive-thru ATM at the Fort Lauderdale Bank of America branch
Red-post directional sign for bank customer parking and the drive-thru ATM at the Fort Lauderdale Bank of America branch
Illuminated Radiation Oncology channel letters above a hospital entrance
Illuminated Radiation Oncology channel letters above a hospital entrance
Completed Tesla monument sign installation on Federal Highway, Fort Lauderdale
Completed Tesla monument sign installation on Federal Highway, Fort Lauderdale

Our sign permit process

  1. Code check and site survey - we confirm the jurisdiction, measure the wall or site, photograph conditions and check the sign against local code and landlord criteria.
  2. Drawings and engineering - permit drawings with elevations, sign dimensions and electrical and attachment details, plus signed and sealed engineering where required.
  3. Signatures and approvals - owner authorization, often notarized, and landlord, association or design review approval.
  4. Filing - we submit under our own license in the correct permit category, online or at the counter.
  5. Plan review and comments - our permit runner tracks the review, revises drawings and resubmits until the permit is issued.
  6. Inspections and closeout - we schedule and meet the inspectors, close the permit and send you the final paperwork and photos.

Municipalities we work in

South Florida has dozens of separate building and zoning departments, and each one reads the sign code its own way. We regularly work in unincorporated Miami-Dade and cities such as Miami, Doral, Hialeah, Miami Beach, Coral Gables and Medley; in Broward cities including Fort Lauderdale, Hollywood, Pembroke Pines and Plantation; and in Palm Beach County cities including Boca Raton, West Palm Beach and Palm Beach Gardens. Some cities add a design review board, and properties next to a city line can need approval from both jurisdictions.

Code limits we check before we file

  • Sign area - most cities tie allowed sign area to your building or tenant frontage.
  • Placement and setbacks - wall sign position, and for freestanding signs, setbacks and sight triangles.
  • Illumination - brightness limits and restrictions near residential property.
  • Wind load - Miami-Dade and Broward are in the Florida Building Code High-Velocity Hurricane Zone, so attachments, structures and foundations are engineered for it.
  • Landlord and association criteria - letter height, colors, lighting and mounting rules in centers and office parks.

What affects the timeline

Permit time depends on the city, how complete the first submittal is, the number of review comments, landlord or design review approval, engineering, and inspection availability. A complete, correct package the first time is the biggest thing that keeps a permit moving, which is why we survey and check code before we file.

What the client provides

  • The job address, including suite or bay number, and a photo of the sign location.
  • Sign drawings or artwork, and the landlord's sign criteria if you lease.
  • Property owner contact so we can arrange the owner signature.
  • Any existing permit numbers or city comments if a permit is already in progress.

Where we work

From our shop in Doral we handle sign permits across Miami-Dade, Broward and Palm Beach counties, including Miami, Doral, Hialeah, Fort Lauderdale, Boca Raton and West Palm Beach. See our full South Florida service area.

Related services

Frequently asked questions

Do I need a permit for my business sign in Miami?

For a permanent exterior sign, almost always, and lit signs need electrical approval too. A few small signs are exempt in some cities. Send us the address and sign and we will tell you what is required.

Can you pull a permit for a sign another company built?

Yes. We permit and install signs built by national sign companies and fabricators, answer comments locally and close out the inspections. See our national sign partner page.

Do lit signs need a separate electrical permit?

In many South Florida cities, yes. As a licensed and insured sign contractor we handle the electrical permit and inspection ourselves.

What happens if the city sends corrections?

Our permit runner reviews the comments, we revise drawings or get updated engineering and resubmit. If a comment needs something from you or your landlord, we tell you right away.

My permit expired or another contractor left the job. Can you help?

Usually. Expired permits can often be extended or reissued, and we can take over a permit from another contractor where the jurisdiction allows it.

Do I need my landlord's approval?

If you lease, almost always. Most centers and office buildings approve signs against their own criteria before the city sees them. We prepare that submittal for you.

Request a site survey

Tell us about your sign and location and we will schedule a site survey or follow up with next steps. Prefer to talk? Call 305-500-9313.

Corporate Signs Inc. | 5960 NW 99th Ave - Bay 8, Doral, FL 33178 | 305-500-9313 | [email protected] | Licensed and insured | Serving South Florida since 1995

Send us the site address, photos and any drawings you already have.

Request a Site Survey

Or call 305-500-9313

Ready to plan your sign project?

Request a site survey and we will walk the site, check code and map out the next steps.

Established in 1995, Corporate Signs Inc. has been a trusted partner for businesses seeking premium signage solutions. Our team of experienced professionals combines creativity with technical expertise to deliver signage that exceeds expectations.

OUR SITE

Copyright 2026. Corporate Signs Inc.